banner
Products
Our ISO certification demonstrates our commitment to excellence.
Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

Overview Product Description Steam heating system, including steam supply system and condensate recovery system. The tra;
Basic Info
Model NO. BTLN
Function Condensate Recovery
Transport Package Woodencase
Specification Different As Each Model
Trademark Beite
Origin China
HS Code 8438900000
Production Capacity 700pieces/Year
Product Description

Steam heating system, including steam supply system and condensate recovery system.
The traditional condensate recovery system is that condensate is discharged from the heat-using equipment, enters the open condensate tank through a water evacuator, is sent back to the boiler room by the condensate pump, mixed with softening and de-oxygenation, and then sent to the boiler through the boiler pump. In this open system, condensate flashing occurs when it enters the open condensate tank.
This causes two problems: first, the loss of condensate when flash steam enters the atmosphere, and secondly, the condensation heat taken away by flash steam, which lowers the temperature of condensate. Therefore, the open condensate recycling system causes both heat and condensate loss, and the secondary steam entering the atmosphere causes thermal pollution to the surrounding environment.
In order to solve this problem, Bett, after years of practice and summary, based on the current domestic and foreign "liquid-liquid injection" and "pneumatic water return" technologies, developed and produced a high-temperature condensate recovery device suitable for a variety of operating conditions, overcoming the steam and water transport of two streams and water transport problems of the two streams.
The condensate return is composed of a flash tank, a decontaminator, a condensate quick discharge device, a pressure balancing device, a cavitation eliminator, a water storage tank, and a liquid level transducer.
When the high-temperature condensate enters the flash tank, the separation of vapor and water is carried out in the tank, and the condensate flows into the water storage tank through the quick discharge device, and the production of secondary gas is sent into the condensate pump discharge pipe through the lead injection device, so that the flash steam can be sealed and recovered.
Flash steam tank due to the gas and liquid constantly excluded, so that the pressure in the flash tank always remain lower than the pressure of the condensate discharge outlet of the heat equipment, thus ensuring that the back pressure of the return water can enter smoothly even in the case of the lower.
The flash tank is connected to the water storage tank through a quick discharge device, and in order to let the condensate flow into the water storage tank quickly, a pressure balancing device is set up in the tank.
Usually, its working pressure is set at 0.1MPa or less, and in the actual selection, the corresponding tank working pressure will be selected according to the high or low back pressure of the return water, so that the tank will always remain sealed.
It is widely used in industrial sectors such as petrochemical, medicine, food, heat, metallurgy, rubber, automobile and steam boiler condensate recovery system in hotels, hospitals, shopping malls, office units, also suitable for civil steam heating and central air conditioning refrigeration system. It is the newer product of open condensate tank, which plays an important role in energy saving and environmental protection.

m3/ hmmD1
mm
D2
mm
D3
mm
DNHH1H2H3
BTLN- 1180019008701001470655050
BTLN- 2280019008701001470655050
BTLN- 441000235510501001850806565
BTLN- 661000235510501001850806565
BTLN- 881000235510501001850806565
BTLN- 101012002570120010020001006580
BTLN- 202012002620125010020501006580
BTLN- 3535160030401360100226015080100
BTLN- 5050180038801400100315020080100

Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems


Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

Company Profile

Nanjing Beite Air Conditioning Equipment is a comprehensive high-tech enterprise that specializes in the research and development, production, sales, and after-sales service of HVAC water treatment equipment. Our company is equipped with two production plants, four standardized workshops, and two office buildings, with a total area of 48,000 square meters. Our main focus is to provide our customers with one-stop supply and service for their HVAC water treatment needs, and to help solve descaling, filtration, and system stability issues in water systems.

At Nanjing Beite Air Conditioning Equipment, we are dedicated to providing our customers with high-quality equipment and excellent customer service. Our products are designed to improve the performance and efficiency of HVAC systems, as well as other types of water systems, and can help reduce maintenance costs associated with mineral buildup and system instability. Whether you are in need of HVAC water treatment equipment or equipment for another type of water system, Nanjing Beite Air Conditioning Equipment is your go-to source for top-notch products and service.

Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

Improving Boiler Thermal Efficiency Condensate Recovery in HVAC Systems

FAQ

Q1: Can I have a sample ?

A : Yes, welcome to place sample order to test and check quality. Mixed samples are also OK.

Q2: What is your lead time for production?
A : Generally Sample needs 1-3 days,mass production needs 15-30 days,also depands on your request.

Q3 : Can you accept mixed batch of different products?
A : Yes,we can provide different product mix wholesale.

Q4: What payment terms do you accept?
A :Trade assurance,TT,Western Union.

Q5 : What is the warranty for your products?
A :We provide one year warranty for the products..

Q6 : Are you trading company or manufacturer?
A :Yes,We are manufacturer.Welcome to visit our factory and check our pruducts.

Q7: What terms of payment do you accept?
A: Payment method:T/T,western union.

Q8: What is your delivery time?
A: Delivery term:15-30 working days.

Send inquiry