banner
Products
Our ISO certification demonstrates our commitment to excellence.
Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Package size per unit product 400.00cm * 200.00cm * 200.00cm Gross weight per unit product 6000.000kg After Service;
Basic Info
Model NO. ACM-S-1200
Raw Material Mixing
Structure Top Feed
Knife Classification Claw Knife Crusher
Knife Roll Solid Knife Roller
Automation Automatic
Computerized Computerized
Certification CE, ISO9001:2008
Motor Siemens Beide
Blade Material SKD-11
Warrenty Time 13 Monthes
Application All Plastics
Inverter ABB
Transport Package Strench Film and Wood Pallet
Specification ACM-C-500
Trademark ACM
Origin China
HS Code 8477800000
Production Capacity 200 Sets
Packaging & Delivery
Package size per unit product 400.00cm * 200.00cm * 200.00cm Gross weight per unit product 6000.000kg
Product Description

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

Drum PVC Pipe Pet Bottle LDPE Film HDPE Rubber Tire Wood Lump Plastic Bottles Crusher and Shredder

 

After Service
Technical documentation
All symbols on the equipment will be in English. We will be responsible for providing the Buyer with a general layout plan, electrical plan, installation orientation and manuals, in English.
Arrangements for inspection, installation and testing of the equipment
a. After all of the equipment is delivered to the customer's factory, the Buyer shall be responsible for all preparation work, e.g. electricity supply, water supply, cranes and labor, etc.b. We will prepare visa applications for their engineers, who will assist in the equipment installation and testing at the Buyer's factory. c. The Buyer will buy a round-trip air ticket for the engineer(s) after the visa application is approved. The Buyer is responsible for all expenses generated, e.g. visa application fees, meals, accommodation and an allowance of $80.00 per day for each engineer.d. The engineer(s) will provide free training for the operators and maintenance people, in Buyer's factory.e. If the Buyer does not request commissioning by our engineer(s) within four months from the date of the bill of lading, it will be accepted that all the equipment has been successfully tested and approved by the Buyer.
Quantity and quality guarantee
a. In cases of quantity discrepancies or equipment damage, at the destination, the Buyer will file a claim within 30 days after the arrival of the goods at its destination. The insurance company and the shipping company will be responsible for all discrepancies and damage caused by the shipping company or other transportation companies. b. Guarantee period and after-sales services: 13 months from the date of the bill of lading.During this guarantee period, if there is a quality issue, we will provide spare parts without charge. If malfunctions are caused by the Buyer's improper operation of equipment, we will provide the Buyer with spare parts at cost prices. c. Long-term service:Beyond one year, we will provide the Buyer with spare parts at reasonable prices and provide long-term technical guidance.
Send inquiry